Rail Construction Project
Unilift was asked to design and manufacture a rigging and lifting system for lifting 120 metre lengths of rail and 7 lengths per lift with a head height of 10 meters…
Unilift was asked to design and manufacture a rigging and lifting system for lifting 120 metre lengths of rail and 7 lengths per lift with a head height of 10 meters…
During the early stages of the tunnelling project engineers contacted Unilift to discuss the need for specialised lifting beams and spreader bars for mobilisation of drill rigs…
Unilift were contacted to perform an inspection on an 800 tonne heavy-lift crane barge, of the main hoist ropes, boom suspension pendants and mooring winch ropes prior to mobilisation…